At this time, the goal of the national transition milestone remains on porting current functionality in the National Centers’ version of AWIPS (N-AWIPS) into AWIPS-2 to assure readiness for the shift to the cloud framework. To that end, the AWC continues to make strides towards that goal, including reaching technical readiness for three desks and conducting operational readiness testing on two of those, as well as continuing to work with APO to build in required functionality for three additional desks. In addition, work is ongoing to develop requirements for the AWC’s contingent of National Aviation Meteorologist (NAM) forecasters at the Federal Aviation Administration's (FAA) Air Traffic Control Systems Command Center (ATC) in Warrenton, VA, and -as the first to do so at the AWC- establish those requirements in the AWIPS cloud framework. An update of AWC’s AWIPS-2 transition progress and subsequent challenges and successes will be presented along with a view of the future in the plans to shift the ATC onto the cloud framework.
- Indicates paper has been withdrawn from meeting
- Indicates an Award Winner