Monday, 15 January 2001: 5:15 PM
The reliability of the Electrochemical Concentraton Cell (ECC) ozonesonde depends on the care exercised in preparing the instrument for use. Although the ECC can be quickly prepared and flown, generally within less then one day if necessary, it is best to prepare the instrument at least one week prior to use, and as our tests have confirmed even 2-3 weeks prior to use may actually be better. There are a number of factors that must be considered when preparing an ECC. These basically are the pump efficiency, volumetric flow rate, temperature of the air entering the pump, and the background current. Also of importance is the concentration of the potassium iodide solution. Tests conducted at Wallops Island (38 N) has enabled us to identify potential problem areas and ways to avoid them. The calibration and pre-flight preparation methods will be discussed. The method of calibrating the ECC also is used at Ascension Island (8 S) and Natal, Brazil (5 S). Comparisons between vertical profiles of the ECC instrument and satellites will be reviewed as well as comparison with ground based instruments, such as, the Dobson Spectrophotometer and hand held Microtops photometers.
- Indicates paper has been withdrawn from meeting
- Indicates an Award Winner