Approach/Activities. The inventory, ground truthing, and visualization of all significant natural infrastructure, BMPs, stormwater conveyances, and outfalls at JBLE-Langley has allowed the installation to fully understand their potential in terms of increasing the adaptive capacity of the nation’s oldest Air Force Base. Understanding the natural inventory and its potential diversification and expansion is the first step in determining how to maximize the output of ecosystem services increasing BMP or conveyance resiliency across the installation.
Actions such as reducing or eliminating lawn maintenance in appropriate areas, expansion of meadowlands, expansion of wetlands, rehabilitation of ghost forests, redesigning wet channels, and utilizing open areas for water detention and discharge are all fundamental components of the Basewide Strategic Planting Initiative. Additionally, the feasibility of converting underutilized horse stables or recreational areas into a 10-acre tidal wetlands mitigation credit to support future MILCON or installation of additional coastal BMPs will be evaluated. As a value-added effort, all unnecessary concrete was inventoried. The timing of actions and/or removal of unnecessary concrete will be coordinated with pending MILCON to provide the various stormwater and nutrient reduction credits needed as the installation grows into an ever-expanding mission while facing the challenges of climate change.
Results/Lessons Learned. Over 200 treatment areas were identified during the Basewide Strategic Planting Initiative. The most effective proposed actions and their resulting ecosystem services were monetized based on replacement or market value. It was determined that the ecosystem services generated for these treatment areas alone will return $10 for every $1 invested over the next 50 years.
- Indicates paper has been withdrawn from meeting
- Indicates an Award Winner